Traffic Updates – Apr’24
Cllr Beckitt highlighted important outstanding issues: –
Plough Lane/Rake Lane Junction
Still awaiting Speed Limit Reduction signage and painting of warning lines on road.
Haslin Crescent Pedestrian Crossing
- Install traffic signals ahead warning signs – flashing signs were preferred but not std for traffic signals.
- Repaint all the white lines from Toll Bar Road to Haslin Crescent and from the other direction.
- Replace reflectorised bollards from Toll Bar Road to Haslin Cresent.
- Repair push button on the west side of Whitchurch Road 5-Undertake a survey early in the New Year to establish movements and sight line issues on sunny conditions – this is unlikely to result in any further action as the CWAC view is that this is not an issue.Still awaiting installation of warning sign re traffic signals ahead.
Plough Lane/Quarry Lane Junction Flooding
Welsh Water carried out an audit of their pumps and discovered a broken pump in the vicinity of Sandrock Road. The pump has been replaced and hopefully this will resolve the problem.
Footpath in front of Christleton Primary School
Meeting with Highways and School to be arranged.
Rowton Bridge Road
Awaiting low-cost alternative scheme from Highways.
A41 Share User Path
Highways have agreed to install a “Cyclists Dismount” sign on A41 railway bridge.
Birch Heath Lane Build Out
Still in backlog
Discover more from Christleton Parish Council
Subscribe to get the latest posts sent to your email.